Skip to content
PIAGOGO! Site Ready

Equipment management

Plant gets turned around the same way people do.

An overdue service stops a machine at the entrance exactly as a lapsed ticket stops a worker. Registrations, services and inspections held in the same register as your people — so nothing leaves the yard that will not get on.

The GO! Site Ready equipment register, listing plant with its status and compliance

Working with PIAGO

  • Frontline Equipment Maintenance
  • BRW Transport
  • Hydrapower
  • Kerembla
  • Premier Plant Repairs & Fabrication
  • Whiteman Welding
Customer stories

How it works

From a machine in the yard to one that will get through.

The equipment register

Step 01

Every machine gets a record

Identifiers, registrations, make and model, and the documents that go with them — held against the asset rather than in a folder named after whoever scanned it.

Want to see your own plant checked against a client's requirements?

The full list

Everything in equipment management.

The equipment register

Every asset with its own record — identifiers, registrations, make and model, operational notes — searchable rather than held in somebody's head.

Certifications and inspections

Inspections and certifications tracked as dated records, so their currency is computed the same way a worker's ticket is.

Service intervals

What is due, what is overdue, and what is coming up — before the machine is loaded rather than after it is refused.

Site requirements for plant

Each client site's requirements for the equipment coming onto it, so a machine is assessed against where it is actually going.

Expiry alerts

The same tiered notifications your people's credentials get, sent to whoever has to act on them.

Documents and attachments

The certificate, the report, the compliance plate photograph — attached to the asset rather than emailed around when somebody asks.

Assignment and deployment

Assign equipment to a job and to the people operating it, visible across the schedule and the register at once.

Asset status

Commissioning, active, decommissioning and disabled, so what is genuinely available is distinguishable from what is merely on the list.

Equipment in your reporting

Plant appears in the compliance reports and the dashboard beside your people, rather than in a separate export nobody joins up.

Owned or hired

Machines you own and machines you have brought in are held the same way, because a client's gate does not distinguish between them.

The difference

What changes when the gear is held to the same standard.

How it usually goes

  • Plant compliance lives in a different system from the people's, or nowhere.
  • A service is overdue and nobody knows until the machine is refused.
  • The certification is in the ute, in a folder, in somebody's photos.
  • “Is that excavator right for their site?” is answered from memory.
  • Where a machine is right now is a phone call, or three.

With GO! Site Ready

  • People and equipment in one register, held to the same standard.
  • Service and inspection dates surface before they lapse.
  • Documents attached to the asset they belong to, and dated.
  • Assessed against that client's requirements for that worksite.
  • The assignment is on the record and on the schedule.

Questions about equipment

Why track equipment in the same system as people?
Because the site assesses them together. A critical control is only verified if the person performing it is competent and the plant involved is fit for purpose — so if those two facts live in separate systems, somebody reassembles the pairing by hand every time a client asks. It is also the most common way a mobilisation stalls: the operator is cleared and the machine is not.
We use a maintenance system already. Does this replace it?
Not necessarily, and we will say so on a call. A maintenance system exists to keep machines running; this exists to prove a machine is fit to go onto a particular client's site today. Plenty of contracting companies run both. If yours already produces site-ready evidence on demand, you may not need this half.
Does it handle hired plant as well as what we own?
Yes, and it should — a client's gate does not care whose name is on the asset. Hired machines are held in the same register with the same requirements against them.
What happens when a service falls due mid-job?
It surfaces ahead of the date rather than on it, against the jobs the machine is assigned to, so in most cases you are scheduling the service rather than recovering from a refusal.
Different clients want different things from the same machine. Can it cope?
Yes. Requirements are held per site, so one excavator can be cleared for one client and short of something for another, with the specific gap named rather than a blanket flag.

See your own plant against a client's requirements.

Bring what a site asks of your gear and we will run a real machine through it on the call.

Not the person who signs it off?

Send it to your GM