Contractor compliance
Induction is day one. Compliance is every day after that.
The approval you granted six months ago is only as good as the records behind it. A lapse should be surfaced, not discovered at the gate — so requirements are worked out per role, evidence is held as dated records, and a schedule you set does the chasing.

Working with PIAGO
How it works
How a ticket goes from required, to current, to chased.
Step 01
Requirements follow the person
A training needs analysis works out what a worker must hold from the role, crew and employment type they are actually in. Move them and the requirements move with them — nobody maintains a master list of who needs what.
Want to see what would be expiring across your workforce this month?
The full list
Everything in ongoing compliance.
Live compliance per worker
Open any worker's profile and see their status right now — which qualifications are required, which are current, which are approaching expiry, which have lapsed. No report run needed.
Expiry alerts you configure
Set the review windows that suit your operation — 90, 60 and 30 days is a common pattern — and choose who hears about them. Workers can be notified directly.
Renewal workflows
Re-upload new evidence, redo an online course, or carry unchanged evidence forward when only the dates move. The record updates in place and every change writes history.
Change-driven re-qualification
Change a worker's role, crew or employment type and the requirements recalculate. A new mandatory requirement resets the profile for re-approval.
Bulk validity changes
When a skill's validity period changes, change it once at the skill rather than worker by worker, and every holder updates.
Termination and re-hire
Archive a worker and their site-specific qualifications expire immediately, with the access system updated at once. History is preserved if they come back.
Where you see it
Three views of the same records.
- The individual training profile
- One worker, everything they hold, and what is required of them.
- The skills matrix
- The whole workforce against the requirements of their roles, in one grid.
- Compliance reports
- Run on demand or on a schedule, and exportable for an audit.
All three read the same records.
There is no separate compliance database kept in step with the training one — the matrix, the profile and the reports are three ways of looking at the same evidence.
The difference
What changes when the records age themselves.
How it usually goes
- The spreadsheet is only as current as the last person who updated it.
- A lapse is discovered at the gate, or by an auditor.
- Someone moves crew, and nobody re-checks what they now need to hold.
- A ticket’s validity period changes, so every holder is edited by hand.
- Somebody leaves, and their card still works on Monday.
With GO! Site Approved
- Every record carries its own expiry date, so the status is always current.
- Scheduled reports surface what is close to lapsing, on a cadence you set.
- Change a role or crew and the requirements recalculate on their own.
- Change the validity once at the skill, and every holder updates.
- Archive a worker and their site qualifications expire immediately.
Questions about ongoing compliance
We track this in a spreadsheet and it works. What are we missing?
Does it warn us before something expires, or do we have to look?
What happens when someone changes role or crew?
A ticket's validity period changed. Do we re-do every worker?
What happens to access when we terminate someone?
The rest of the pipeline
It does not stop here.
The obligation behind this
Plain-English explainers, free, whether you ever buy anything or not.
Related reading
Worth reading next.
NSW Mining Compliance Priorities for 2026 — What Contracting companies Need to KnowThe NSW Resources Regulator has set its 2026 compliance priorities. Here's what contracting companies operating in NSW need to have in order before inspectors arrive.Read it
Queensland's Critical Control Changes in 2026: What They Mean for Contracting companies, Not Just Mine OperatorsQueensland's 2026 critical control rules sit with operators but flow through to contracting companies. What you must be able to evidence about your people and plant, on demand.Read it
Could You Prove It to a Judge?When an incident happens on a mine site, investigators don't ask how compliant you feel. They ask for documentation. Could you produce it right now?Read it

See ongoing compliance in action.
Book a demo built around your sites and your requirements, not a generic walkthrough.
Not the person who signs it off?
Send it to your GM








