Site access
Compliance status, wired to the gate.
Approval is not a piece of paper. It is whether the card works when somebody puts it against the reader — so access reflects real compliance status, and somebody who has lapsed does not get through on a card issued months ago.

Working with PIAGO
How it works
How an approval turns into a working card.
Step 01
Approval becomes permission
Clearing a worker for your site and granting them access are the same act, not two systems kept in step. Because they are not held in two places, they cannot drift apart.
Want to see this working against your own access control system?
The full list
Everything in site access.
WinDsx — live in production
Full two-way. Card provisioning and access rule updates flow out to the access system; swipe data flows back, which is what powers presence, fatigue and exceptions.
Gallagher — built and delivered
Card provisioning and permission updates flow outbound, keeping each worker’s card current with their compliance status. Swipe data does not return on this integration.
Who is on site now
Live presence from the gate rather than from a sign-in sheet. WinDsx installations only, since it depends on swipe data coming back.
Access events and the exception queue
Anomalies at the reader surface as a queue to be resolved rather than as a log nobody reads. WinDsx installations only.
Fatigue rules
Configure maximum hours, pre-entry limits and minimum rest gaps. Breaches notify the right people. WinDsx installations only.
Emergency response — who is on site
During an incident, see which ERT-trained workers are on site right now, rather than working it out from a roster.
The difference
What it takes for an approval to reach the gate.
How it usually goes
- Compliance lives in one system and the card reader lives in another.
- Somebody is approved on Friday and still cannot badge in on Monday.
- “Who is on site right now” means counting cars, or ringing the gatehouse.
- Fatigue limits are a policy in a document, not a check at the gate.
- In an evacuation, the muster list is whoever signed the visitor book.
With GO! Site Approved
- Compliance status and the access system are wired together, both ways.
- Approval issues the card. Losing compliance withdraws it.
- A live presence view, straight off the readers.
- Maximum hours and rest gaps are checked, and a breach raises an alert.
- The ERT-trained workers currently on site, listed instantly.
Questions about site access
Our access control already works. What does this add?
What is the difference between the WinDsx and Gallagher integrations?
What happens at the gate when someone’s ticket lapses?
Can we enforce fatigue rules through the gate?
In an emergency, can we tell who is on site?
The rest of the pipeline
It does not stop here.
The obligation behind this
Plain-English explainers, free, whether you ever buy anything or not.
Related reading
Worth reading next.
When You Are the Subcontractor, Whose Compliance Problem Is It?On a shared mine site, safety duties are held concurrently. Being the subcontractor does not shed the duty, it shares it. What consult, cooperate, coordinate means for you.Read it
NSW Mining Compliance Priorities for 2026 — What Contracting companies Need to KnowThe NSW Resources Regulator has set its 2026 compliance priorities. Here's what contracting companies operating in NSW need to have in order before inspectors arrive.Read it
Could You Prove It to a Judge?When an incident happens on a mine site, investigators don't ask how compliant you feel. They ask for documentation. Could you produce it right now?Read it

See site access against your own access control.
Tell us what you run at the gate and we will show you exactly what the integration does and does not cover.
Not the person who signs it off?
Send it to your GM








