Contractor induction
Enforce your standards, not somebody else's.
A worker who tells you they are already inducted was inducted at somebody else's mine, to somebody else's standards. Set your requirements once, and everyone coming through your gate meets them — the contracting companies you engage, your own employees, and visitors — with a record of who approved what, and when.

Working with PIAGO
How it works
What actually happens, start to finish.
Step 01
Your standards, enforced
Set what your site requires once — the documents, the training, the approval steps. From then on the pathway will not accept a half-finished application or the wrong document, so nothing incomplete reaches your desk and there is nothing to chase.
Want to see this pathway running on your own site’s requirements?
The full list
Everything in contractor induction.
Site-specific workflows
Configure the requirements, steps and approvals that apply at your operation. Different sites can run different pathways without a second system.
The application steps
Personal details, emergency contacts, job role and department — which determines which qualifications apply — health declarations, document upload and your declarations.
Multi-step approval with attribution
Every sign-off is recorded against a named person. Approve, request more information, or reject with a reason that sends it back to be corrected.
Backup approvers
Cover for leave without handing over a login. A backup approver is a permission, not a shared account, so the attribution stays honest.
E-learning gate
Where your site requires online induction training, workers complete it after document approval. The application is not fully approved until they do.
Multi-stage inductions
Hang role-specific inductions off a short general induction. Details entered in the first carry forward — nothing is re-entered.
Remote facilitated assessments
For qualifications that need a live facilitator rather than a click-through course: the assessor controls each lesson, watches answers in real time, runs the correction process and signs off each worker individually. Built for and delivered to a large coal operation running its generic site induction at scale.
Induction day scheduling
Where your operation runs structured induction events, bookings, attendance and qualification recording happen in the same place.
The difference
What a controlled pathway actually changes.
How it usually goes
- Applications arrive by email, half-finished, and get chased by hand.
- “Already inducted” means inducted at someone else’s mine, to their standard.
- The approval is somewhere in an inbox, so nobody can say who signed it off.
- Covering for leave means handing over a login.
- The online training is a reminder, and reminders get ignored.
With GO! Site Approved
- The application cannot be submitted until every requirement is met.
- Your requirements, configured once, applied to everyone at your gate.
- Every sign-off recorded against a named person, with a date.
- A backup approver is a permission, not a shared password.
- Approval is withheld until the e-learning is actually finished.
Questions about induction
We already induct our contracting companies. What does this change?
Does the worker fill this in themselves?
What happens if the approver is on leave?
Can we reject part of an application without starting again?
We run a general induction plus role-specific ones. Does that work?
The rest of the pipeline
It does not stop here.
The obligation behind this
Plain-English explainers, free, whether you ever buy anything or not.
Related reading
Worth reading next.
Contractor Onboarding vs Site Induction: What's the Difference?Contractor onboarding and site induction often get used interchangeably — but they're not the same thing. Here's what each one actually means, where they overlap, and where the difference matters.Read it
A Ticket and a VOC Are Not the Same Thing, and Your Clients Know ItA ticket says a worker was trained once. A VOC says they can do the task on your gear now. Why VOCs slip, and how to keep them current across every site.Read it
Could You Prove It to a Judge?When an incident happens on a mine site, investigators don't ask how compliant you feel. They ask for documentation. Could you produce it right now?Read it

See the induction pathway on your own requirements.
Bring your site’s requirements and we will configure the pathway against them, rather than showing you ours.
Not the person who signs it off?
Send it to your GM








